Neilly Group (NG) undertook detailed design of remediation measures for significant gully erosion located downstream of a large water dam on Woodleigh Station near Mt Garnet. The detailed design consisted of a large rock chute spillway to return water to the downstream creek system, rather than allowing it to bywash into a large gully that has formed as a result of not having a dedicated spillway. The rock chute also included an incorporated fishway due to the requirements of a waterway barrier development approval which was triggered during the project.

LOCATION:
Herbert River Basin, QLD
CAPABILITY: